PLANT REVAMPING AT OUR HEADQUARTERS

 

Plant: heat treatment to metal compounds

Work performed: demolition of the old ceramic fiber insulation
system. Restoration of insulating rigid panels
manufactured in strips, using ceramic fibers T 1.430 °C

 

Pictures before the work

Pictures after revamping (performed c/o SIM S.r.l. headquarters):


Plant: F.A.P. (Diesel Particulate Filter)

Work performed: Demolition of the old ceramic fiber
insulation.
Restoration of insulating rigid panels on the
compressed fiber modules wall on vault and
door (bio-soluble fiber)
Reconstruction and laying of heating
elements (ceramic + bare wire resistance)

 

Pictures before the work

Pictures after the revamping (performed at SIM S.r.l. headquarters)


Plant: production for ceramic oxides pre-sintering
(colorants)

Work performed: demolition of the old ceramic fiber insulation.
Restoration of insulating rigid panels on the
compressed fiber modules wall on vault and
door (bio-soluble fiber)
Reconstruction and laying of heating elements
(ceramic + bare wire resistance)

 

Pictures before the work

Pictures after revamping


Plant: molten aluminum cover for holding furnace

Work performed: demolition of the old ceramic fiber insulation
and worn resistors
Restoration of the pre-compressed modules
insulations
Reconstruction and laying of heating elements

Plant: heat treatment to metal compounds

Work performed: complete furnace demolition (insulation,
bottom, ceramic components and electric
resistances), components reconstruction and
laying.